18 CFR 5.19 - Tendering notice and schedule
Cite as | 18 CFR 5.19 |
-
- This document is available in original version only for vLex customers
View this document and try vLex for 7 days - TRY VLEX
- This document is available in original version only for vLex customers
4 practice notes
-
Electric utilities (Federal Power Act):
Hydroelectric licensing regulations,
...filing of mandatory conditions or prescriptions by the agencies in response to any draft EIS or EA; and issuance of any final EIS or EA. 18 CFR 5.19(a). When FERC determines that the application meets various requirements, that the approved studies have been completed, that any deficiencies......
-
Electric utilities (Federal Power Act):
Hydroelectric licensing regulations,
...\288\ 18 CFR 5.8(b)(2). \289\ 18 CFR 5.6(d)(3)(v). \290\ 18 CFR 5.8(b)(3)(viii). \291\ 18 CFR 5.9(a). \292\ 18 CFR 5.18(b)(3)(ii). \293\ 18 CFR 5.19(b). In addition, although it is not reflected in the regulations, our well-established practice is to issue a biological assessment with the d......
-
Part II
...filing of mandatory conditions or prescriptions by the agencies in response to any draft EIS or EA; and issuance of any final EIS or EA. 18 CFR 5.19(a). When FERC determines that the application meets various requirements, that the approved studies have been completed, that any deficiencies......
-
Separate Parts In This Issue
Part II
Energy Department, Federal Energy Regulatory Commission,
...\288\ 18 CFR 5.8(b)(2). \289\ 18 CFR 5.6(d)(3)(v). \290\ 18 CFR 5.8(b)(3)(viii). \291\ 18 CFR 5.9(a). \292\ 18 CFR 5.18(b)(3)(ii). \293\ 18 CFR 5.19(b). In addition, although it is not reflected in the regulations, our well-established practice is to issue a biological assessment with the d......