18 CFR 5.23 - Response to notice
Cite as | 18 CFR 5.23 |
-
- This document is available in original version only for vLex customers
View this document and try vLex for 7 days - TRY VLEX
- This document is available in original version only for vLex customers
10 practice notes
-
Electric utilities (Federal Power Act):
Hydroelectric licensing regulations,
...Comments, protests, recommendations, and preliminary conditions and prescriptions must be filed with FERC within 60 days after the REA. 18 CFR 5.23(a). All reply comments must be filed within 105 days of the REA. 18 CFR 5.23(a). If FERC determines that an EIS or a draft and final EA will be......
-
Electric utilities (Federal Power Act):
Hydroelectric licensing regulations,
...reply comments, which would not affect the proposed time periods for issuance of NEPA documents.\354\ \353\ Proposed 18 CFR 5.22. \354\ 18 CFR 5.23(a). Changes to Traditional Process and The NOPR proposed four significant changes to the traditional process: (1) Full public participation; (2......
-
Part II
...Comments, protests, recommendations, and preliminary conditions and prescriptions must be filed with FERC within 60 days after the REA. 18 CFR 5.23(a). All reply comments must be filed within 105 days of the REA. 18 CFR 5.23(a). If FERC determines that an EIS or a draft and final EA will be......
-
Separate Parts In This Issue
Part II
Energy Department, Federal Energy Regulatory Commission,
...reply comments, which would not affect the proposed time periods for issuance of NEPA documents.\354\ \353\ Proposed 18 CFR 5.22. \354\ 18 CFR 5.23(a). Changes to Traditional Process and The NOPR proposed four significant changes to the traditional process: (1) Full public participation; (2......
Request a trial to view additional results