Pretreatment Program Requirements: Development and Implementation by POTW

CurrencyCurrent through May 31, 2023
Citation 40 C.F.R. §403.8
    • This document is available in original version only for vLex customers

      View this document and try vLex for 7 days
    • TRY VLEX
14 cases
  • United States v. Stabl, Inc.
    • United States
    • U.S. District Court — District of Nebraska
    • May 21, 2013
    ... ... of the limits permitted by its pretreatment permit issued by the State of Nebraska, (3) ... testimony of the manager of Lexington's POTW, Jess Bliven ( see Filing No. 61-12). (Filing ... are admissible subject to the requirements of Fed. R. Evid. 803(6)." Shelton v. Consumer ... of the facility's Nebraska Pretreatment Program Permit." (Filing No. 70-12.) It appears from the ... ...
  • U.S. v. Hajduk
    • United States
    • U.S. District Court — District of Colorado
    • October 19, 2005
    ... ... Owned Treatment Works ("Persigo" or "POTW"), a city owned facility that regulates water ... is required to develop a regulatory program that prescribes limits for effluent that enters ... Pre-treatment Standards and Requirements by Industrial Users. Representatives of the POTW ... Pretreatment Standards." ...         40 C.F.R. § ... ...
  • Cerro Copper Products Co. v. Ruckelshaus
    • United States
    • U.S. Court of Appeals — Seventh Circuit
    • July 1, 1985
    ... ... Protection Agency concerning the pretreatment of wastewater discharge from industrial ... a publicly owned treatment works plant ("POTW")--pretreat their wastewater discharge before ... of this title, then the pretreatment requirements for the sources actually discharging such toxic ... This statutory removal credit program allows indirect dischargers to modify the ... from the factors considered during development of a categorical Pretreatment Standard applicable ... Act and is vital to the EPA's implementation of the Act. The removal credit program, enacted ... ...
  • U.S. v. Borowski
    • United States
    • U.S. Court of Appeals — First Circuit
    • July 27, 1992
    ... ... Protection Agency (EPA) to design pretreatment standards for industrial waste discharges into ... which will interfere with the operation of a POTW, including interference with its use or disposal ... ...
  • Request a trial to view additional results
2 books & journal articles
  • Potws and pretreatment
    • United States
    • Introduction to environmental law: cases and materials on water pollution control - 2d Edition
    • July 23, 2017
    ...potential for adversely afecting the POTW’s operation or for violating any Pretreatment Standard or Requirement (in accordance with 40 CFR 403.8(f)(6)). * * * 3.2 PROHIBITIVE DISCHARGE STANDARDS 3.2.1) It shall be unlawful for any User to contribute or cause to be contributed, directly or i......
  • CHAPTER 6 ENVIRONMENTAL ISSUES IN OPERATING OIL AND NATURAL GAS PIPELINES
    • United States
    • FNREL - Special Institute Oil and Natural Gas Pipelines- Wellhead to End User (FNREL)
    • Invalid date
    ...(D.Colo. 1993). [20] 33 U.S.C. § 1342 (West 1993). [21] 40 C.F.R. § 122.26(b)(14) (1994). [22] 33 U.S.C. § 502(14) West 1993). [23] 40 C.F.R. § 403.8 (1994) [24] 40 C.F.R. § 123.44 (1994) Provides for the permissible review and action periods available to the administrator of the program. [......
12 provisions
  • Illinois Register Volume 41, Issue 05, February 3, 2017, Pages 748-1274
    • United States
    • Illinois Register
    • January 1, 2017
    ...3.2(c) (2016), as added at 70 Fed. Reg. 59848 (Oct. 13, 2005). BOARD NOTE: Subsection (a) is derivedDerived from 40 CFR 3, as added, and 40 CFR 403.8(g) (2016) (2005), as amended at 70 Fed. Reg. 59848 (Oct. b) NPDES Electronic Reporting. 1) Purpose and Scope. A) This subsection (b), in conj......
  • MO Register Vol. 37 No. 5. (Pages 307-436)
    • United States
    • Missouri Register
    • January 1, 2012
    ...A new proposed rule in place of this rescission will incorporate by reference the Environmental Protection Agency's federal regulation 40 CFR Part 403. The proposed rule for general pretreatment will allow for continued implementation and enforcement of the federal requirements under the cu......
  • 06- 096 C.M.R. ch. 856, § 6 Persons Not Required to Obtain a License
    • United States
    • Maine Administrative Code 2023 Edition 06. Department of Environmental Protection 096. Department of Environmental Protection - General Chapter 856. Licensing of Hazardous Waste Facilities
    • January 1, 2023
    ...is subject to a water discharge license pursuant to 38 M.R.S. §§413 through 414(B), Pretreatment Program, 06-096 C.M.R. ch. 528, or 40 C.F.R. §§403.8 and 403.9 agreement) containing limits on the hazardous characteristics and any hazardous constituents for which the waste is hazardous (see ......
  • Illinois Register Volume 40, Issue 44, October 28, 2016, Pages 14,374-14,816
    • United States
    • Illinois Register
    • January 1, 2016
    ...3.2(c) (2016), as added at 70 Fed. Reg. 59848 (Oct. 13, 2005). BOARD NOTE: Subsection (a) is derivedDerived from 40 CFR 3, as added, and 40 CFR 403.8(g) (2016) (2005), as amended at 70 Fed. Reg. 59848 (Oct. b) NPDES Electronic Reporting. 1) Purpose and Scope. A) This subsection (b), in conj......
  • Request a trial to view additional results

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT