40 CFR 125.95 - Permit application and supporting information requirements
Cite as | 40 CFR 125.95 |
-
- This document is available in original version only for vLex customers
View this document and try vLex for 7 days - TRY VLEX
- This document is available in original version only for vLex customers
6 practice notes
-
Water pollution control:
National Pollutant Discharge Elimination System
Cooling water intake structures at Phase III facilities; requirements,
...to ensure compliance during subsequent permit terms. The TIOP must be developed and submitted to the Director in accordance with 40 CFR 125.95(b)(4)(ii). The Restoration Plan must be developed in accordance with 40 CFR 125.95(b)(5). 6. Public EPA worked extensively with stakeholders from th......
-
National Pollutant Discharge Elimination System-Final Regulations To Establish Requirements for Cooling Water Intake Structures at Existing Facilities and Amend Requirements at Phase I Facilities
...rule provides that the owner or operator of a facility may submit a request to the Director to reduce the information required. See 40 CFR 125.95(c). In most cases, EPA anticipates the facility would make any such request prior to conducting its two years of biological data collection. Ther......
-
Part II
...to ensure compliance during subsequent permit terms. The TIOP must be developed and submitted to the Director in accordance with 40 CFR 125.95(b)(4)(ii). The Restoration Plan must be developed in accordance with 40 CFR 125.95(b)(5). 6. Public EPA worked extensively with stakeholders from th......
-
Riverkeeper, Inc. v. U.S. E.P.A., Docket No. 04-6692-ag(L).
...must submit with its application a Comprehensive Cost Evaluation Study, Benefits Valuation Study, and Site Specific Technology Plan. 40 C.F.R. § 125.95(b)(6). As part of the Benefits Valuation Study, the facility must indicate the monetized value of commercial, recreational, and ecological ......
Request a trial to view additional results
3 cases
-
Cooling Water Intake Structure Coal. v. U.S. Envtl. Prot. Agency, Docket Nos. 14-4645(L)
...that regulated facilities must include in their permit applications information about the presence of ESA-listed species. 40 C.F.R. § 125.95(f). The Director who reviews the application then sends it to the Services for a sixty-day review period, after which the Director must publish any in......
-
Riverkeeper, Inc. v. U.S. E.P.A., Docket No. 04-6692-ag(L).
...must submit with its application a Comprehensive Cost Evaluation Study, Benefits Valuation Study, and Site Specific Technology Plan. 40 C.F.R. § 125.95(b)(6). As part of the Benefits Valuation Study, the facility must indicate the monetized value of commercial, recreational, and ecological ......
-
Cooling Water Intake Structure Coal. v. U.S. Envtl. Prot. Agency, Docket Nos. 14-4645(L)
...that regulated facilities must include in their permit applications information about the presence of ESA-listed species. 40 C.F.R. § 125.95(f). The Director who reviews the application then sends it to the Services for a sixty-day review period, after which the Director must publish any in......