18 CFR 5.5 - Notification of intent
Cite as | 18 CFR 5.5 |
-
- This document is available in original version only for vLex customers
View this document and try vLex for 7 days - TRY VLEX
- This document is available in original version only for vLex customers
24 practice notes
-
Electric utilities (Federal Power Act):
Hydroelectric licensing regulations,
...begins with the applicant's filing with FERC a notice of intent (NOI) to file an application for an original, new, or subsequent license. 18 CFR 5.5. The NOI must be filed 5-5\1/2\ years before the existing license expires. 18 CFR 5.5(d). Along with the NOI, the applicant must file a pre-ap......
-
Electric utilities (Federal Power Act):
Hydroelectric licensing regulations,
...The Process Group agreed in general with these commenters that there should be more time in the process for such interaction. \79\ Proposed 18 CFR 5.5 and \80\ Interior refers to proposed 18 CFR 5.7 through 5.12. As discussed below, we have modified the process to extend the time for partic......
-
Part II
...begins with the applicant's filing with FERC a notice of intent (NOI) to file an application for an original, new, or subsequent license. 18 CFR 5.5. The NOI must be filed 5-5\1/2\ years before the existing license expires. 18 CFR 5.5(d). Along with the NOI, the applicant must file a pre-ap......
-
Separate Parts In This Issue
Part II
Energy Department, Federal Energy Regulatory Commission,
...The Process Group agreed in general with these commenters that there should be more time in the process for such interaction. \79\ Proposed 18 CFR 5.5 and \80\ Interior refers to proposed 18 CFR 5.7 through 5.12. As discussed below, we have modified the process to extend the time for partic......
Request a trial to view additional results
3 cases
-
Desert Pumped Storage, LLC, 15030-000
...project's impact on fish and wildlife resources and the cumulative impacts of basin development are premature at the permit stage). [18] 18 C.F.R. §§ 5.5-5.6 (2020). [19] Id. § 5.3 (2020). --------- ...
-
In re PacifiCorp, 15246-000
...[46] See, e.g., Sheep Falls Assoc, 34 FERC ¶ 61, 196 (1986); Hudson River-Black River Regulating Dist, 33 FERC ¶ 61, 122 (1985). [47] 18 C.F.R. §§ 5.5 & 5.6 (2021). [48] See id. § 5.3 (2021). [49] See City of Fayetteville, 16 FERC ¶ 61, 209 (1981). --------- ...
-
In re PacifiCorp, 15239-000
...See, e.g., Sheep Falls Assocs., 34 FERC ¶ 61, 196 (1986); Hudson River-Black River Regulating Dist, 33 FERC ¶ 61, 122 (1985). [43] 18 C.F.R. §§ 5.5 & 5.6 (2020). [44] See id. § 5.3 (2020). [45] See City of Fayetteville, 16 FERC ¶ 61, 209 (1981). --------- ...