18 CFR 5.5 - Notification of intent

Cite as18 CFR 5.5
    • This document is available in original version only for vLex customers

      View this document and try vLex for 7 days
    • TRY VLEX
24 practice notes
  • Electric utilities (Federal Power Act): Hydroelectric licensing regulations,
    • United States
    • Federal Register November 17, 2005
    • November 17, 2005
    ...begins with the applicant's filing with FERC a notice of intent (NOI) to file an application for an original, new, or subsequent license. 18 CFR 5.5. The NOI must be filed 5-5\1/2\ years before the existing license expires. 18 CFR 5.5(d). Along with the NOI, the applicant must file a pre-ap......
  • Electric utilities (Federal Power Act): Hydroelectric licensing regulations,
    • United States
    • Federal Register August 25, 2003
    • August 25, 2003
    ...The Process Group agreed in general with these commenters that there should be more time in the process for such interaction. \79\ Proposed 18 CFR 5.5 and \80\ Interior refers to proposed 18 CFR 5.7 through 5.12. As discussed below, we have modified the process to extend the time for partic......
  • Part II
    • United States
    • Federal Register November 17, 2005
    • November 17, 2005
    ...begins with the applicant's filing with FERC a notice of intent (NOI) to file an application for an original, new, or subsequent license. 18 CFR 5.5. The NOI must be filed 5-5\1/2\ years before the existing license expires. 18 CFR 5.5(d). Along with the NOI, the applicant must file a pre-ap......
  • Separate Parts In This Issue Part II Energy Department, Federal Energy Regulatory Commission,
    • United States
    • Federal Register August 25, 2003
    • August 25, 2003
    ...The Process Group agreed in general with these commenters that there should be more time in the process for such interaction. \79\ Proposed 18 CFR 5.5 and \80\ Interior refers to proposed 18 CFR 5.7 through 5.12. As discussed below, we have modified the process to extend the time for partic......
  • Request a trial to view additional results
3 cases
  • Desert Pumped Storage, LLC, 15030-000
    • United States
    • Federal Energy Regulatory Commission
    • November 18, 2021
    ...project's impact on fish and wildlife resources and the cumulative impacts of basin development are premature at the permit stage). [18] 18 C.F.R. §§ 5.5-5.6 (2020). [19] Id. § 5.3 (2020). --------- ...
  • In re PacifiCorp, 15246-000
    • United States
    • Federal Energy Regulatory Commission
    • May 19, 2022
    ...[46] See, e.g., Sheep Falls Assoc, 34 FERC ¶ 61, 196 (1986); Hudson River-Black River Regulating Dist, 33 FERC ¶ 61, 122 (1985). [47] 18 C.F.R. §§ 5.5 & 5.6 (2021). [48] See id. § 5.3 (2021). [49] See City of Fayetteville, 16 FERC ¶ 61, 209 (1981). --------- ...
  • In re PacifiCorp, 15239-000
    • United States
    • Federal Energy Regulatory Commission
    • May 19, 2022
    ...See, e.g., Sheep Falls Assocs., 34 FERC ¶ 61, 196 (1986); Hudson River-Black River Regulating Dist, 33 FERC ¶ 61, 122 (1985). [43] 18 C.F.R. §§ 5.5 & 5.6 (2020). [44] See id. § 5.3 (2020). [45] See City of Fayetteville, 16 FERC ¶ 61, 209 (1981). --------- ...