18 CFR 5.17 - Filing of application
Cite as | 18 CFR 5.17 |
-
- This document is available in original version only for vLex customers
View this document and try vLex for 7 days - TRY VLEX
- This document is available in original version only for vLex customers
7 practice notes
-
Electric utilities (Federal Power Act):
Hydroelectric licensing regulations,
...information requests. 18 CFR 5.16. At least 2 years before the existing license expires, the application must be filed with FERC. 18 CFR 5.17(a). Within 14 days of that filing, FERC must issue public notice of the filing and a preliminary schedule for expeditious processing of the applicati......
-
Electric utilities (Federal Power Act):
Hydroelectric licensing regulations,
...certain criteria, as applicable to the facts of that case.\193\ \191\ Proposed 18 CFR 5.15 (Draft license application). \192\ Proposed 18 CFR 5.17 (Application \193\ Proposed 18 CFR 5.15. Need for Draft Application We requested comments on whether, in lieu of filing a draft license applicat......
-
Part II
...information requests. 18 CFR 5.16. At least 2 years before the existing license expires, the application must be filed with FERC. 18 CFR 5.17(a). Within 14 days of that filing, FERC must issue public notice of the filing and a preliminary schedule for expeditious processing of the applicati......
-
Separate Parts In This Issue
Part II
Energy Department, Federal Energy Regulatory Commission,
...certain criteria, as applicable to the facts of that case.\193\ \191\ Proposed 18 CFR 5.15 (Draft license application). \192\ Proposed 18 CFR 5.17 (Application \193\ Proposed 18 CFR 5.15. Need for Draft Application We requested comments on whether, in lieu of filing a draft license applicat......
Request a trial to view additional results