40 C.F.R. §403.10 - Development and submission of NPDES State pretreatment programs
Cite as | 40 C.F.R. §403.10 |
-
- This document is available in original version only for vLex customers
View this document and try vLex for 7 days - TRY VLEX
- This document is available in original version only for vLex customers
21 practice notes
-
Environmental Protection Agency,
...for the NPDES program under 40 CFR 122.21, 122.41, 122.44 and 123.25, and for the implementation of the pretreatment standards under 40 CFR 403.10 and 403.12. To date, EPA has promulgated methods for conventional pollutants, toxic pollutants, and for some non-conventional pollutants. The fi......
-
Part II
...An authorized state which does not approve POTW programs but assumes local responsibility by acting as the Control Authority under 40 CFR 403.10(e) is required to implement all elements of the Pretreatment program established for POTWs in 40 CFR 403.8(f), including the establishment of loca......
-
National Pollutant Discharge Elimination System (NPDES) Electronic Reporting Rule
...40 CFR 123.45. Noncompliance and program reporting by the Director; this replaces several state reports of noncompliance with the NNCR; 40 CFR 403.10(f). State Pretreatment Program 40 CFR 403.12(e). Periodic reports on continued compliance Pretreatment program reports for Categorical Indust......
-
National Emission Standards for Hazardous Air Pollutants: Publicly Owned Treatment Works
...program Approval Authority. In this scenario, the POTW might interpret the third criterion as not applying to them. For instance, 40 CFR 403.10(e) allows a state to assume responsibility for implementing the POTW Pretreatment Program requirements set forth in 403.8(f) in lieu of requiring t......
Request a trial to view additional results
3 cases
-
United States v. Stabl, Inc.
...must ensure that industrial users that discharge effluent into wastewater treatment plants comply with pretreatment requirements. See 40 C.F.R. § 403.10. Companies that discharge effluent into water and wastewater treatment plants can be liable for pass-through, which occurs when discharge ......
-
United States v. Stabl, Inc., 14-2050
...must ensure that industrial users that discharge effluent into wastewater treatment plants comply with pretreatment requirements. See 40 C.F.R. § 403.10. Companies that discharge effluent into water and wastewater treatment plants can be liable for pass-through, which occurs when discharge ......
-
U.S. v. City of Detroit, Michigan, 89-72937.
...delegated to Michigan in 1973, and in 1983 Michigan was granted permission to administer an NPDES pretreatment program as provided by 40 C.F.R. 403.10 The City of Detroit operates a POTW which treats industrial sewage from various communities in and outside of Detroit. The State granted the......