10 CFR 50.54 - Conditions of licenses
Cite as | 10 CFR 50.54 |
-
- This document is available in original version only for vLex customers
View this document and try vLex for 7 days - TRY VLEX
- This document is available in original version only for vLex customers
457 practice notes
-
Part III
...systems and networks (i.e., cyber security requirements). 10 CFR 73.58, Safety/security interface requirements for nuclear power reactors. 10 CFR 50.54(hh), Mitigative strategies and response procedures for potential or actual aircraft Specifically, this rulemaking contains a number of sign......
-
Part II
...should be able to make changes or updates to ESP emergency planning information without NRC approval in accordance with the criteria in 10 CFR 50.54(q) just as the remaining safety information can be revised under Sec. 50.59 once it has been reviewed and approved. These commenters also stat......
-
Electronic maintenance and submission of information,
...50 implement these statutory requirements; certain regulations require an oath or affirmation for submission of documents (see, e.g., 10 CFR 50.54(f) and 10 CFR Documents that must be sent by certified mail (e.g., 10 CFR part 30, appendix A II. C. 2). 1.3.4 10 CFR Part 2 Submissions Rulemak......
-
Miscellaneous Corrections
...special/designee.pdf'' and replaces it with the correct Web site address ``https://scp.nrc.gov/special/designee.pdf.'' 10 CFR Part 50 Correct Misspelling. In Sec. 50.34(f)(3)(v)(A)(1) and (B)(1), this final rule removes the misspelled term ``subsubarticle'' and replaces it with the correct ......
Request a trial to view additional results
18 cases
-
Public Service Elec. & Gas Co. v. Local 94 Intern., No. CIV. A. 99-3634 (GEB).
..."access authorization program" and that the program be "incorporated Page 389 into the site Physical Security Plan as provided for by 10 C.F.R. § 50.54(p)(2) and implemented." See 10 C.F.R. § 73.56 (2000). According to § 50.54(p)(2), changes may be made to the Physical Security Plan without......
-
Rockland County v. U.S. Nuclear Regulatory Com'n, Nos. 1234
...plans for the operator-licensee and state and local governments shall be prepared and ready for implementation by April 1, 1981. 10 C.F.R. Sec. 50.54(s)(2)(i) (1982). After that date, FEMA is charged with initial responsibility to review the state of emergency preparedness at the nuclear pl......
-
Pub. Watchdogs v. S. Cal. Edison Co., Case No.: 19-CV-1635 JLS (MSB)
...funds for purposes other than decommissioning activities," id. ¶ 39(f), and on January 5, 2018, the "NRC grant[ed] an exemption to 10 C.F.R. § 50.54(w)(1), which requires the operator of a nuclear power plant to maintain property insurance in the amount of $1.06 billion to ensure adequate f......
-
Massachusetts Public Interest Research Group, Inc. v. U.S. Nuclear Regulatory Com'n, No. 87-1865
...See 10 C.F.R. Sec. 50.47(2) (FEMA findings on emergency response plans will constitute rebuttable presumption in NRC review); and 10 C.F.R. Sec. 50.54(s)(3) FEMA issued two contemporaneous reports evaluating the offsite emergency planning and preparedness of Pilgrim. The first report respon......
Request a trial to view additional results