18 CFR 5.25 - Applications requiring a draft NEPA document
Cite as | 18 CFR 5.25 |
-
- This document is available in original version only for vLex customers
View this document and try vLex for 7 days - TRY VLEX
- This document is available in original version only for vLex customers
6 practice notes
-
Electric utilities (Federal Power Act):
Hydroelectric licensing regulations,
...draft and final EA will be prepared, FERC will issue a draft EIS or EA no later than 180 days from the deadline for responses to the REA. 18 CFR 5.25(a). The draft EIS or EA must include, for comment, any preliminary conditions or prescriptions. 18 CFR 5.25(b). Comments to the draft EIS or ......
-
Electric utilities (Federal Power Act):
Hydroelectric licensing regulations,
...to 10(j) recommendations, the regulations may not be entirely clear in this respect. We have therefore clarified the regulation text. See 18 CFR 5.25(c). The NOPR proposes that modified mandatory terms and conditions be filed 60 days following the deadline date for comments on the draft NEP......
-
Part II
...draft and final EA will be prepared, FERC will issue a draft EIS or EA no later than 180 days from the deadline for responses to the REA. 18 CFR 5.25(a). The draft EIS or EA must include, for comment, any preliminary conditions or prescriptions. 18 CFR 5.25(b). Comments to the draft EIS or ......
-
Separate Parts In This Issue
Part II
Energy Department, Federal Energy Regulatory Commission,
...to 10(j) recommendations, the regulations may not be entirely clear in this respect. We have therefore clarified the regulation text. See 18 CFR 5.25(c). The NOPR proposes that modified mandatory terms and conditions be filed 60 days following the deadline date for comments on the draft NEP......