18 C.F.R. §5.18 - Application content
Cite as | 18 C.F.R. §5.18 |
-
- This document is available in original version only for vLex customers
View this document and try vLex for 7 days - TRY VLEX
- This document is available in original version only for vLex customers
6 practice notes
-
Electric utilities (Federal Power Act):
Hydroelectric licensing regulations,
...too vague, particularly as a preliminary measure, for the costs to be reasonably determined. See the discussion in Section III.O.2. \225\ 18 CFR 5.18(b)(5)(i)(B). Post-Application Study The proposed rule makes no provision for new information- gathering or study requests after a license app......
-
Separate Parts In This Issue
Part II
Energy Department, Federal Energy Regulatory Commission,
...too vague, particularly as a preliminary measure, for the costs to be reasonably determined. See the discussion in Section III.O.2. \225\ 18 CFR 5.18(b)(5)(i)(B). Post-Application Study The proposed rule makes no provision for new information- gathering or study requests after a license app......
-
Electric utilities (Federal Power Act):
Hydroelectric license regulations,
...with respect to any requests for additional information or studies made in comments on the draft license application.\245\ \244\ Proposed 18 CFR 5.18 (Tendering notice and schedule). \245\ Proposed 18 CFR 5.18(b). When all filing requirements are met and the approved study plan is completed......
-
Separate Parts In This Issue
Part II
Energy Department, Federal Energy Regulatory Commission,
...with respect to any requests for additional information or studies made in comments on the draft license application.\245\ \244\ Proposed 18 CFR 5.18 (Tendering notice and schedule). \245\ Proposed 18 CFR 5.18(b). When all filing requirements are met and the approved study plan is completed......