Electric utilities (Federal Power Act):
Hydroelectric licensing regulations,
...Georgia Power and Duke support NHA's proposal. \67\ Duke, PG&E, Troutman, WPPD, Xcel, CHI, Sullivan, NHA, SCE. \68\ See proposed 18 CFR 5.4(c)(2)(A)-(B), (D)-(G), (J) and \69\ See proposed 18 CFR 5.4(c)(2)(H), (I), (K), and (L). NHA adds that critical energy infrastructure information (......
-
Separate Parts In This Issue
Part II
Energy Department, Federal Energy Regulatory Commission,
...Georgia Power and Duke support NHA's proposal. \67\ Duke, PG&E, Troutman, WPPD, Xcel, CHI, Sullivan, NHA, SCE. \68\ See proposed 18 CFR 5.4(c)(2)(A)-(B), (D)-(G), (J) and \69\ See proposed 18 CFR 5.4(c)(2)(H), (I), (K), and (L). NHA adds that critical energy infrastructure information (......
-
Electric utilities (Federal Power Act):
Hydroelectric license regulations,
...more fully described below, which would help to make effective integrated pre-filing consultation and early NEPA scoping. \46\ See proposed 18 CFR 5.4 (Pre-application The advance notification concept received much favorable comment.\47\ All of the process proposals include some form of vol......
-
Separate Parts In This Issue
Part II
Energy Department, Federal Energy Regulatory Commission,
...more fully described below, which would help to make effective integrated pre-filing consultation and early NEPA scoping. \46\ See proposed 18 CFR 5.4 (Pre-application The advance notification concept received much favorable comment.\47\ All of the process proposals include some form of vol......