Code of Federal Regulations - Title 40: Protection of Environment (December 2005)
Permanent Link:
http://cfr.vlex.com/vid/table-9-jjj-63-routine-required-this-19796437
Id. vLex: VLEX-19796437
Click here to download this article in graphic format (Acrobat Reader)
TITLE 40 - PROTECTION OF ENVIRONMENT
CHAPTER I - ENVIRONMENTAL PROTECTION AGENCY
PART 63 - NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES
subpart jjj - NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANT EMISSIONS: GROUP IV POLYMERS AND RESINS
Table 9 to Subpart JJJ of Part 63 - Routine Reports Required by This Subpart
------------------------------------------------------------------------ Description of Reference report Due date ------------------------------------------------------------------------ 63.1335(b) and Refer to Table 1 and Refer to subpart A.
subpart A. subpart A.
63.1335(e)(3)........ Precompliance Report Existing affected \a\. sources_December 19, 2000. New affected sources_with application for approval of construction or reconstruction.
63.1335(e)(4)........ Emissions Averaging September 19, 2000.
Plan.
63.1335(e)(4)(iv).... Updates to Emissions 120 days prior to Averaging Plan. making the change necessitating the update.
63.1335(e)(5)........ Notification of Within 150 days Compliance Status after the \b\. compliance date.
63.1335(e)(6)........ Periodic Reports.... Semiannually, no later than 60 days after the end of each 6-month period. See 63.1335(e)(6)(i) for the due date for the first report.
63.1335(e)(6)(xi).... Quarterly reports No later than 60 for Emissions days after the end Averaging. of each quarter.
First report is due with the Notification of Compliance Status.
63.1335(e)(6)(xii)... Quarterly reports No later than 60 upon request of the days after the end Administrator. of each quarter.
63.1335(e)(7)(i)..... Storage Vessels At least 30 days Notification of prior to the Inspection. refilling of each storage vessel or the inspection of each storage vessel.
63.1335(e)(7)(ii).... Requests for Initial submittal is Approval of a due with the Nominal Control Emissions Averaging Efficiency for Use Plan specified in in Emissions Averaging. 63.1335(e)(4)(ii); later submittals are made at the discretion of the owner or operator as specified in 63.1335(e)(7)(ii) (B).
63.1335(e)(7)(iii)... Notification of 1. For notification Change in the under Primary Product. 63.1310(f)(3)(ii)_n otification submittal date at the discretion of the owner or operator.\c\ 2. For notification under 63.1310(f)(4)(ii)_w ithin 6 months of making the determination.
------------------------------------------------------------------------ \a\ There may be two versions of this report due at different times; one for equipment subject to 63.1331 and one for other emission points subject to this subpart.
\b\ There will be two versions of this report due at different times; one for equipment subject to 63.1331 and one for other emission points subject to this subpart.
\c\ Note that the TPPU remains subject to this subpart until the notification under 63.1310(f)(3)(i) is made.
[66 FR 36939, July 16, 2001]
Try vLex for FREE for 3 days
Access legal information from United States including:
Try vLex without any commitment for 3 days and see why you need it.
3
days of Free Access