Text
TITLE 40 - PROTECTION OF ENVIRONMENT
CHAPTER I - ENVIRONMENTAL PROTECTION AGENCY
PART 63 - NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES
subpart lllll - NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS: ASPHALT PROCESSING AND ASPHALT ROOFING MANUFACTURING
Table 6 to Subpart LLLLL of Part 63 - Requirements for Reports
------------------------------------------------------------------------ The report must You must submit You must submit_ contain_ the report_ ------------------------------------------------------------------------ 1. An initial notification.... The information in According to the 63.9(b). requirements in 63.9(b).
2. A notification of A written notification At least 60 performance test. of the intent to calendar days conduct a performance before the test. performance test is scheduled to begin, as required in 63.9(e).
3. A notification of opacity A written notification According to the and visible emission of the intent to requirements in observations. conduct opacity and 63.9(f).
visible emission observations.
4. Notification of compliance The information in According to the status. 63.9(h)(2) requirements in through (5), as applicable. 63.9(h)(2) through (5), as applicable.
5. A compliance report........ a. A statement that Semiannually there were no according to deviations from the the emission limitations requirements in during the reporting period, if there are 63.8693(b).
no deviations from any emmission limitations (emission limit, operating limit, opacity limit, and visible emission limit) that apply to you.
b. If there were no Semiannually periods during which according to the CPMS, CEMS, or the COMS was out-of- requirements in control as specified in 63.8(c)(7), 63.8693(b).
a statement that there were no periods during which the CPMS, CEMS, or COMS was out-of-control during the reporting period.
c. If you have a Semiannually deviation from any according to emission limitation the (emission limit, requirements in operating limit, opacity limit, and 63.8693(b).
visible emission limit), the report must contain the information in 63.8693(c). If there were periods during which the CPMS, CEMS, or COMS was out-of- control, as specified in 63.8(c)(7), the report must contain the information in 63.8693(d).
d. If you had a Semiannually startup, shutdown or according to malfunction during the the reporting period requirements in and you took actions consistent with your 63.8693(b).
startup, shutdown, and malfunction plan, the compliance report must include the information in 63.10(d)(5)(i).
6. An immediate startup, The information in By fax or shutdown, and malfunction telephone report if you have a startup, 63.10(d)(5)(ii). within 2 shutdown, or malfunction working days during the reporting period after starting and actions taken were not actions consistent with your startup, inconsistent shutdown, and malfunction with the plan plan. followed by a letter within 7 working days after the end of the event unless you have made alternative arrangements with the permitting authority.
------------------------------------------------------------------------
Sponsored links