Text
Title 23: Highways
CHAPTER I: FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION
SUBCHAPTER G: ENGINEERING AND TRAFFIC OPERATIONS
PART 661: INDIAN RESERVATION ROAD BRIDGE PROGRAM
661.51 - Can IRRBP funds be used for the approach roadway to a bridge
(a) Yes, costs associated with approach roadway work, as defined in ? 661.5 are eligible.
(b) Long approach fills, causeways, connecting roadways, interchanges, ramps, and other extensive earth structures, when constructed beyond an attainable touchdown point, are not eligible uses of IRRBP funds.
Sponsored links