46 CFR 61.05-5 - Preparation of boilers for inspection and test.

Code of Federal Regulations - Title 46: Shipping

Linked as:

Text


TITLE 46 - SHIPPING

CHAPTER I - COAST GUARD, DEPARTMENT OF HOMELAND SECURITY

SUBCHAPTER F - MARINE ENGINEERING

PART 61 - PERIODIC TESTS AND INSPECTIONS

61.05 - 5 - Preparation of boilers for inspection and test.

  (a) For internal inspection, manhole and handhold plates, and washout plugs shall be removed as required by the marine inspector and the furnace and combustion chambers shall be thoroughly cooled and cleaned.

Portable obstructions shall be removed as necessary for proper access.

  (b) In preparing the boilers for the hydrostatic test, they shall be filled with water at not less than 70 F. and not more than 160 F. for watertube boilers, and not more than 100 F. for firetube boilers. The safety valves shall be secured by means of gags or clamps.

[CGFR 68-82, 33 FR 18890, Dec. 18, 1968, as amended by CGD 95027, 61 FR 26001, May 23, 1996]

Sponsored links




ver las páginas en versión mobile | web

ver las páginas en versión mobile | web

© Copyright 2012, vLex. All Rights Reserved.

Contents in vLex United States

Explore vLex

For Professionals

For Partners

Company