40 CFR 52.2223 - Compliance schedules.

Text


Title 40: Protection of Environment

CHAPTER I: ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)

SUBCHAPTER C: AIR PROGRAMS (CONTINUED)

PART 52: APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED)

Subpart RR: Tennessee

52.2223 - Compliance schedules.

(a) Federal compliance schedules?State program. (1) Except as provided in paragraph (a)(5) of this section, the owner or operator of any boiler or furnace of more than 250 million Btu per hour heat input subject to the requirements of Chapter 1200-3-14 of the Rules and Regulations of Tennessee as contained in the Tennessee implementation plan, shall notify the Administrator, no later than January 1, 1974, of his intent to utilize either low-sulfur fuel or stack gas desulfurization to meet these requirements.

(2) Any owner or operator of a stationary source subject to paragraph (a)(1) of this section who elects to utilize low-sulfur fuel shall be subject to the following compliance schedule:

(i) January 31, 1974: Submit to the Administrator a projection of the amount of fuel, by types, that will be substantially adequate to enable compliance with the applicable regulation on July 1, 1975, and for at least one year thereafter.

(ii) March 31, 1974: Sign contracts with fuel suppliers for fuel requirements as projected above.

(iii) April 30, 1974: Submit a statement as to whether boiler modifications will be required. If modifications will be required, submit plans for such modifications.

(iv) May 31, 1974: Let contracts for necessary boiler modifications, if applicable.

(v) October 31, 1974: Initiate onsite modifications, if applicable.

(vi) June 1, 1975: Complete onsite modifications, if applicable.

(vii) July 1, 1975: Achieve compliance with the requirements of Chapter 1200-3-14 of the Rules and Regulations of Tennessee and certify compliance to the Administrator.

(viii) If a performance test is necessary for a determination as to whether compliance has been achieved, such a test must be completed on or before July 1, 1975. Ten days prior to such a test, notice must be given to the Administrator to afford him the opportunity to have an observer present.

(ix) Five days after the deadline for completing increments (a)(2) (ii) through (vi) in this section certification as to whether the increments were met shall be made to the Administrator.

(3) Any owner or operator of a stationary source subject to paragraph (a)(1) of this section who elects to utilize stack gas desulfurization shall be subject to the following compliance schedule:

(i) January 31, 1974?Submit to the Administrator a final control plan, which describes at a minimum the steps which will be taken by the source to achieve compliance with the applicable regulations.

(ii) February 28, 1974?Negotiate and sign all necessary contracts for emission-control systems or process modification, or issue orders for the purchase of component parts to accomplish emission control or process modification.

(iii) May 1, 1974?Initiate onsite construction or installation of emission-control equipment or process modification.

(iv) May 1, 1975?Complete onsite construction or installation of emission control equipment or process modification.

(v) July 1, 1975?Achieve compliance with the requirements of Chapter 1200-3-14 of the Rules and Regulations of Tennessee and certify compliance to the Administrator.

(vi) If a performance test is necessary for a determination as to whether compliance has been achieved, such a test must be completed on or before July 1, 1975. Ten days prior to such a test, notice must be given to the Administrator to afford him the opportunity to have an observer present.

(vii) Five days after the deadline for completing increments (a)(3) (ii) through (iv) in this section, certification as to whether the increments were met shall be made to the Administrator.

(4) Except as provided in paragraph (a)(5) of this section, the owner or operator of any stationary source subject to the requirements of Chapter 1200-3-14 of the Rules and Regulations of Tennessee as contained in the Tennessee implementation plan, shall comply with the following compliance schedule:

(i) November 15, 1973: Submit to the Administrator a final control plan, which describes at a minimum the steps which will be taken by the source to achieve compliance with the applicable regulations.

(ii) January 1, 1974: Negotiate and sign all necessary contracts for emission control systems or process modifications, or issue orders for the purchase of component parts to accomplish emission control or process modification.

(iii) February 1, 1974: Initiate onsite construction or installation of emission control equipment or process modification.

(iv) May 1, 1975: Complete onsite construction or installation of emission control equipment or process modification.

(v) July 1, 1975: Achieve compliance with the applicable regulations and certify such compliance to the Administrator.

(vi) If a performance test is necessary for a determination as to whether compliance has been achieved, such a test must be completed on or before July 1, 1975. Ten days prior to such a test, notice must be given to the Administrator to afford him the opportunity to have an observer present.

(vii) Five days after the deadline for completing increments (a)(4)(ii) through (iv) in this section certification as to whether the increments were met shall be made to the Administrator.

(5) (i) None of the above paragraphs shall apply to a source which is presently in compliance with applicable regulations and which has certified such compliance to the Administrator by October 1, 1973. The Administrator may request whatever supporting information he considers necessary for proper certification.

(ii) Any compliance schedule adopted by the State and approved by the Administrator shall satisfy the requirements of this paragraph for the affected source.

(iii) Any owner or operator subject to a compliance schedule in this paragraph may submit to the Administrator no later than October 1, 1973, a proposed alternative compliance schedule. No such compliance schedule may provide for final compliance after the final compliance date in the applicable compliance schedule of this paragraph. If promulgated by the Administrator, such schedule shall satisfy the requirements of this paragraph for the affected source.

(6) The compliance schedules in paragraphs (a)(2) and (3) of this section shall not excuse a source from complying with any interim emission limitations on the date prescribed in the Tennessee air pollution control regulation listed in paragraph (a)(1) of this section.

(7) Nothing in this paragraph shall preclude the Administrator from promulgating a separate schedule for any source to which the application of the compliance schedules in the above paragraphs of this paragraph fail to satisfy the requirements of ?? 51.261 and 51.262(a) of this chapter.

(b) The requirements of ? 51.262(a) of this chapter are not met since compliance schedules with adequate increments of progress have not been submitted for every source for which they are required.

(c) [Reserved]

(d) The compliance schedules for the sources identified below are disapproved as not meeting the requirements of Subpart N of this chapter. All regulations cited are air pollution control regulations of the State or those of a local air pollution control agency as noted.

(1) State compliance schedules:

SourceLocationState regulation involvedDate of adoption
Burlington Industries, Inc. (State order No. 7-0073)Washington County, TennCh. 6, sec. 4Mar. 20, 1973.
Monsanto Co., kilns Nos. 1 and 2 (State order No. 8-0073)Maury County, TennCh. 7, sec. 8Do.
Monsanto Co., kiln No. 3 (State order No. 20-0073)......doCh. 7, sec. 8Do.
Stauffer Chemical Co......doCh. 7, sec. 8Do.
Tennessee Eastman Co.:
(a) Bldg. 267: Chem. A, vent 1-A (State order No. 15-0073)Sullivan County, TennCh. 7, sec. 8Do.
(b) Bldg. 267: Chem. B, vent 1-A (State order No. 25-0073)......doCh. 7, sec. 8Do.
(c) Bldg. 267: Chem. C, vent 1-A (State order No. 26-0073)......doCh. 7, sec. 8Do.
(d) Bldg. 267: Chem. D, vent 1-A (State order No. 17-0073)......doCh. 7, sec. 8Do.
(e) Bldg. 267: Chem. E, vent 1-A, (State order No. 16-0073)......doCh. 7, sec. 8Do.
(f) B3A-1 (State order No. 18-0073)......doCh. 7, sec. 8Do.
(g) B13-1 (State order No. 19-0073)......doCh. 7, sec. 8Do.
(h) B13-3 (State order No. 24-0073)......doCh. 7, sec. 8Do.


(e) Federal compliance schedules?Local programs. (1) Except as provided in paragraph (e)(16) of this section, the owner or operator of any stationary source subject to the following emission limiting regulations of the Knox County Air Pollution Control Regulations and the City of Memphis Air Pollution Control Code and Shelby County Air Pollution Control Code contained as part of the Tennessee implementation plan shall comply with the compliance schedule in paragraph (e)(2) of this section: Knox County Air Pollution Control Regulations, Sections 18.2C; 19.4B; 20.1D; and 23.1; City of Memphis Air Pollution Control Code and Shelby County Air Pollution Control Code Section 3-24(d).

(2) Compliance schedule. (i) October 1, 1973?Submit to the Administrator a final control plan, which describes at a minimum the steps which will be taken by the source to achieve compliance with the applicable regulations.

(ii) December 1, 1973?Negotiate and sign all necessary contracts for emission control systems or process modifications, or issue orders for the purchase of component parts to accomplish emission control or process modification.

(iii) January 1, 1974?Initiate onsite construction or installation of emission control equipment or process modification.

(iv) May 1, 1975?Complete onsite construction or installation of emission control equipment or process modification.

(v) July 1, 1975?Achieve compliance with the applicable regulations and certify such compliance to the Administrator.

(3) Except as provided in paragraph (e)(16) of this section, the owner or operator of any stationary source subject to the following emission limiting regulation of the Knox County Air Pollution Control Regulations contained as part of the Tennessee implementation plan shall comply with the compliance schedule in paragraph (e)(4) of this section: Knox County Air Pollution Control Regulations, Section 19.2C.

(4) Compliance schedule. (i) October 1, 1973?Submit to the Administrator a final control plan, which describes at a minimum the steps which will be taken by the source to achieve compliance with the applicable regulations.

(ii) December 1, 1973?Negotiate and sign all necessary contracts for emission control systems or process modifications, or issue orders for the purchase of component parts to accomplish emission control or process modification.

(iii) January 1, 1974?Initiate onsite construction or installation of emission control equipment or process modification.

(iv) May 1, 1975-Complete onsite construction or installation of emission control equipment or process modification.

(v) June 1, 1975?Achieve compliance with the applicable regulations and certify such compliance to the Administrator.

(5) Except as provided in paragraph (e)(16) of this section, the owner or operator of any boiler or furnace of more than 250 million Btu per hour heat input subject to the requirements of Knox County Air Pollution Control Regulations, section 18.4B; and City of Memphis Air Pollution Control Code and Shelby County Air Pollution Control Code, Section 3-24(b), contained as part of the Tennessee implementation plan shall notify the Administrator no later than October 1, 1973, of his intent to utilize either low-sulfur fuel or stack gas desulfurization to meet these requirements.

(6) Any owner or operator of a stationary source subject to paragraph (e)(5) of this section who elects to utilize low-sulfur fuel shall be subject to the following compliance schedule:

(i) November 1, 1973?Submit to the Administrator a projection of the amount of fuel, by types, that will be substantially adequate to enable compliance with the applicable regulation on July 1, 1975, and for at least one year thereafter.

(ii) December 31, 1973?Sign contracts with fuel suppliers for fuel requirements as projected above.

(iii) January 31, 1974?Submit a statement as to whether boiler modifications will be required. If modifications will be required, submit plans for such modifications.

(iv) March 15, 1974?Let contracts for necessary boiler modifications, if applicable.

(v) June 15, 1974?Initiate onsite modifications, if applicable.

(vi) March 31, 1975?Complete onsite modifications, if applicable.

(vii) July 1, 1975?Achieve compliance with the requirements of Knox County Air Pollution Control Regulations, section 18.4B and City of Memphis Air Pollution Control Code and Shelby County Air Pollution Control Code Section 3-24 (b) and certify such compliance to the Administrator.

(7) Any owner or operator of a stationary source subject to paragraph (e)(5) of this section who elects to utilize stack gas desulfurization shall be subject to the following compliance schedule:

(i) November 1, 1973?Submit to the Administrator a final control plan, which describes at a minimum the steps which will be taken by the source to achieve compliance with the applicable regulation.

(ii) January 1, 1974?Negotiate and sign all necessary contracts for emission control systems or process modification, or issue orders for the purchase of component parts to accomplish emission control or process modification.

(iii) February 1, 1974?Initiate onsite construction or installation of emission control equipment or process modification.

(iv) May 1, 1975?Complete onsite construction or installation of emission control equipment or process modification.

(v) July 1, 1975?Achieve compliance with the applicable regulation and certify such compliance to the Administrator.

(8) Except as provided in paragraph (e)(16) of this section, the owner or operator of any stationary source subject to the following emission limiting regulation of the Hamilton County Air Pollution Control Regulations contained as part of the Tennessee implementation plan shall comply with the compliance schedule in paragraph (e)(9) of this section: Hamilton County Air Pollution Control Regulations, rule 10 (particulate emissions from process operations).

(9) Compliance schedule. (i) September 15, 1973?Submit to the Administrator a final control plan, which describes at a minimum the steps which will be taken by the source to achieve compliance with the applicable regulations.

(ii) November 1, 1973?Negotiate and sign all necessary contracts for emission control systems or process modifications, or issue orders for the purchase of component parts to accomplish emission control or process modification.

(iii) December 1, 1973?Initiate onsite construction or installation of emission control equipment or process modifications.

(iv) June 1, 1974?Complete onsite construction or installation of emission control equipment or process modification.

(v) July 1, 1974?Achieve compliance with the applicable regulations, and certify such compliance to the Administrator.

(10) Except as provided in paragraph (e)(16) of this section, the owner or operator of any process (non-fuel burning) source of sulfur dioxide subject to the emission limiting requirements of the Hamilton County Air Pollution Control Regulations, rule 13, contained as part of the Tennessee implementation plan shall comply with the compliance schedule in paragraph (e)(9) of this section.

(11) Except as provided in paragraph (e)(16) of this section, the owner or operator of any boiler or furnace of more than 250 million Btu per hour heat input subject to the sulfur dioxide emission limiting requirements of the Hamilton County Air Pollution Control Regulations, rule 13, contained as part of the Tennessee implementation plan shall notify the Administrator, no later than October 1, 1973, of his intent to utilize either low-sulfur fuel or stack gas desulfurization to meet these requirements.

(12) Any owner or operator of a fuel burning facility subject to paragraph (e)(11) of this section who elects to utilize low-sulfur fuel shall be subject to the following compliance schedule:

(i) November 1, 1973?Submit to the Administrator a projection of the amount of fuel, by types, that will be substantially adequate to enable compliance with the applicable regulation on July 1, 1974, and for at least one year thereafter.

(ii) December 1, 1973?Sign contracts with fuel suppliers for fuel requirements as projected above.

(iii) January 1, 1974?Submit a statement as to whether boiler modifications will be required. If modifications will be required, submit plans for such modifications.

(iv) February 1, 1974?Let contracts for necessary boiler modifications, if applicable.

(v) February 15, 1974?Initiate onsite modifications, if applicable.

(vi) June 15, 1974?Complete onsite modifications, if applicable.

(vii) July 1, 1974?Achieve compliance with the requirements of Hamilton County Air Pollution Control Regulations, rule 13, and certify such compliance to the Administrator.

(13) Any owner or operator of a fuel burning facility subject to paragraph (e)(11) of this section who elects to utilize stack gas desulfurization shall be subject to the following compliance schedule:

(i) November 1, 1973?Submit to the Administrator a final control plan, which describes at a minimum the steps which will be taken by the source to achieve compliance with the applicable regulations.

(ii) December 1, 1973?Negotiate and sign all necessary contracts for emission control systems or process modifications, or issue orders for the purchase of component parts to accomplish emission control or process modification.

(iii) December 15, 1973?Initiate onsite construction or installation of emission control equipment or process modification.

(iv) June 15, 1974?Complete onsite construction or installation of emission control equipment or process modification.

(v) July 1, 1974?Achieve compliance with the applicable regulations, and certify such compliance to the Administrator.

(14) If a performance test is necessary for a determination as to whether compliance has been achieved, such a test must be completed by the final compliance date in the applicable regulation. Ten days prior to such a test, notice must be given to the Administrator to afford him the opportunity to have an observer present.

(15) Any owner or operator subject to a compliance schedule above shall certify to the Administrator, within five days after the deadline for each increment of progress in that schedule, whether or not the increment has been met.

(16)(i) None of the above paragraphs shall apply to a source which is presently in compliance with applicable regulations and which has certified such compliance to the Administrator by October 1, 1973. The Administrator may request whatever supporting information he considers necessary for proper certification.

(ii) Any compliance schedule adopted by the State and approved by the Administrator shall satisfy the requirements of this paragraph for the affected source.

(iii) Any owner or operator subject to a compliance schedule in this paragraph may submit to the Administrator no later than October 1, 1973, a proposed alternative compliance schedule. No such compliance schedule may provide for final compliance after the final compliance date in the applicable compliance schedule of this paragraph. If promulgated by the Administrator, such schedule shall satisfy the requirements of this paragraph for the affected source.

(17) No compliance schedule in this paragraph shall excuse a source from complying with an interim emission limitation that is applicable to such source.

(18) Nothing in this paragraph shall preclude the Administrator from promulgating a separate schedule for any source to which the application of a compliance schedule in this paragraph fails to satisfy the requirements of ?? 51.261 and 51.262(a) of this chapter.

(f) The compliance schedules for the sources identified below are approved as meeting the requirements of Subpart N and ? 51.6 of this chapter. All regulations cited are air pollution control regulations of the State or those of a local air pollution control agency as noted.

(1) Statewide compliance schedules:

Tennessee
SourceLocationRegulation involvedDate of adoptionEffective dateFinal compliance date
Aluminum Co. of America, State order No. 79-00073AlcoaCH.V-2(b), CH. VII-2Oct. 9, 1973ImmediatelyAug. 9, 1974.
American Enka, State order No. 64-00073:
(a) Boilers 1, 2, 3MorristownCH. V-2(b), CH.VI-2(a)......do......doJuly 1, 1975.
(b) Boilers 4, 5, 6......doCH. VI-2(b), CH. VI-2(a)......do......doDec. 30, 1974.
(c) Boiler 9......doCH. V-2(b), CH. VI-2(a)......do......doJune 30, 1974.
Athens Plow Co., State order No. 4-00073AthensCH. V-2(b), CH. VII-9(b)Mar. 20, 1973......doAug. 9, 1974.
Athens Stove Works, State order No. 55-0073......doCH. V-2(b), CH. VII-9(b)June 19, 1973......doJuly 2, 1974.
Beaunit Fibers, State order No. 56-0073:
(a) Stacks 1 and 2ElizabethtonCH. V-2(a)......do......doMar. 30, 1975.
(b) Stack 3......doCH. VI-2(a), CH. V-2(a)......do......doNov. 30, 1974.
Bedford Lumber Co.:
State order No. 87-00073ShelbyvilleCH. V-2(b), CH. VI-2(a)(2)Oct. 9, 1973......doMar. 1, 1974.
State order No. 88-00073......doCH. V-2(b), CH. VI-2(a)(2)......do......doOct. 9, 1974.
Bristol Foundry & Machine Co., State order No. 71-00073BristolCH. V-2(b), CH. VII-9(b)......do......doNov. 9, 1973.
Bruce Flooring State order No. 72-00073JacksonCH. V-2(b), CH. VII-2......do......doAug. 9, 1974.
Burroughs-Ross-Colville Co.:
State order No. 65-00073: (a) Boiler 1McMinnvilleCH. V-2(b), CH. VI-2(a)2......do......doDo.
State order No. 66-00073:
(a) Collectors C-1, C-3......doCH. V-2(b), CH. VII-2(a)......do......doDo.
(b) Collector C-7......doCH. V-2(b), CH. VII-2(a)......do......doOct. 1, 1973.
Celotex Corp., State Order No. 61-0073:
(a) Collectors A-1-2, B-3, B-4, and E-22ParisCH. V-2(b), CH. VII-2(a)June 19, 1973......doMay 1, 1974.
(b) Collectors D-12, D-13, and D-14......doCH. V-2(b), CH. VII-2(a)......do......doApr. 1, 1974.
(c) Collectors C-0, C-10, and C-11......doCH. V-2(b), CH. VII-2(a)......do......doOct. 30, 1973.
Clarksville Foundry & Machine Works State order No. 73-00073ClarksvilleCH. V-2(b), CH. VII-9(b)Oct. 9, 1973......doJan. 30, 1974.
Dover Corp., State order No. 74-00073MiddletonCH.V-2(b), CH. VI-2(d)......do......doJuly 9, 1974.
Farrar Construction, State order No. 75-00073McMinnvilleCH. V-2(b), CH. VII-9(g)......do......doOct. 9, 1973.
Harris Manufacturing Co., State order No. 62-0073Johnson CityCH.V-2(b), CH. VII-2(a)June 19, 1973......doJune 1, 1974.
Holston Army Ammunition Plant, State order No. 67-00073KingsportCH.V-2(b), CH. VI-2(a)Oct. 9, 1973......doJuly 1, 1975.
Kingsport Foundry & Manufacturing Corp., State order No. 57-0073......doCH.V-2(b), CH. VII-9(b)June 19, 1973......doFeb. 28, 1974.
Koh-i-noor Radiograph, Inc., State order No. 58-0073LewisburgCH.V-2(b), CH. VII-2(a)......do......doMar. 29, 1974.
Lenoir Car Works, State order No. 76-00073Lenoir CityCH. V-2(b), CH. VII-2Oct. 9, 1973......doDec. 9, 1973.
Marquette Cement Manufacturing Co., State order No. 5-0073CowanCH. V-2(b), CH. VII-2Mar. 20, 1973......doAug. 9, 1974.
Mead Corp., State order No. 59-0073KingsportCH. V-2(b), CH. VI-2(a)(1)June 19, 1973......doJuly 1, 1975.
Monsanto Co., State order No. 6-0073:
(a) Source 4ColumbiaCH. V-2, CH. VII-2Mar. 20, 1973......doMar. 9, 1974.
(b) Source 5......doCH. V-2, CH. VII-2......do......doDec. 9, 1973.
Royal Oak Charcoal Co.:
State order No. 77-00073JamestownCH.V-2(b), CH. VII-2Oct. 9, 1973......doJuly 31, 1974.
State order No. 78-00073......doCH. V-2(b), CH.VII-2......do......doMar. 1, 1974.
Stokely-Van Camp, Inc., State order No. 63-0073Tellico PlainsCH.V-2(b), CH. VI-2(a)(2)June 19, 1973......doJan. 30, 1974.
Tennessee Asphalt Co., State order No. 79-00073LaFolletteCH.V-2(b), CH. VII-9(g)Oct. 9, 1973......doDec. 30, 1973.
Tennessee Eastman Co.:
State order No. 80-00073KingsportCH. V-2(b), CH. VII-2......do......doJune 1, 1974.
State order No. 81-00073......doCH. V-2(b), CH. VII-2......do......doAug. 9, 1974.
State order No. 82-00073......doCH.V-2(b), CH. VII-2......do......doNov. 1, 1974.
State order No. 83-00073......doCH. V-2(b), CH. VII-2......do......doJuly 1, 1975.
State order No. 84-00073:
(a) Units 18-22......doCH. V-2(b), CH.VI-2(a)(1)......do......doMar. 1, 1974.
(b) Units 11-17......doCH. VI-2(b), CH. VI-2(a)(1)......do......doJune 1, 1975.
Tennessee Forging Steel Co., State order No. 85-00073HarrimanCH. V-2(b), CH. VII-2......do......doOct. 30, 1973.
Tennessee Metallurgical, State order No. 89-00073:
(a) Furnace No. 2KimballCH.V-2(b), CH. VII-2......do......doMar. 1, 1974.
(b) Furnace No. 1......doCH. V-2(b), CH. VII-2......do......doJan. 15, 1974.
Union Carbide Corp., State order No. 86-00073ColumbiaCH. V-2(b), CH. VII-2......do......doAug. 9, 1974.
United States Stove Co., State order No. 3-0073South PittsburgCH.V-2(b)Mar. 20, 1973......doFeb. 9, 1974.
Aluminum Co. of America, sources 22 and 23 (carbon anode baking)AlcoaCh. V, sec. II.BNov. 28, 1973......doJuly 9, 1974.
Berkline Corp., plant No. 1, collector No. 6MorristownCh. V. sec. II. B; ch. VII, sec. II......do......doJune 9, 1974.
E. I. du Pont: 4 steam boilers, particulate emissions, SO2 emissionsNew JohnsonvilleCh. V, sec. II. B; ch. V, sec. II.A(2)Feb. 6, 1974......doJune 30, 1975.
Industrial Products Co., Inc.: Control equipmentMt. PleasantCh. V, sec. II.B; ch. VII, sec. IINov. 28, 1973......doJan. 1, 1974.
Interstate Foundry & Machine Co.: CupolaJohnson CityCh. V, sec. II. B; ch. VII, sec. IX.B......do......doFeb. 9, 1974.
Laminite Plastics Corp.: Moldow system (phase I only)MorristownCh. V, sec. II. B; ch. VII, sec. II......do......doApr. 30, 1974.
Lea Industries:
Plant No. 4; process emissions......do......do......do......doJan. 1, 1974.
Plant No. 5; process emissions......do......do......do......doAug. 9, 1974.
Plant No. 6; process emissions......do......do......do......doDo.
Plant No. 6, boiler......doCh. V......do......doFeb. 1, 1974.
Lewisburg Casting Co., Inc.: CupolaLewisburg......doNov. 28, 1979......doJune 9, 1974.
A. B. Long Quarries, Inc.: Limestone quarry and crusherHarrimanCh. V, sec. II.B; ch. VII, sec. II: ch. VIII......do......doMar. 30, 1974.
Monsanto Industrial Chemical CoColumbiaCh. VIIFeb. 6, 1973......doJuly 1, 1975.
Plough, Inc.: BoilerShelbyvilleCh. V, sec. II. B; ch. VI, sec. II.A(2)......do......doMay 30, 1974.
Powermatic-Houdaille, Inc.: Two No. 5 cupolasMcMinnvilleCh. V, sec. II.B; ch. VII, sec. II......do......doAug. 9, 1974.
Royal Oak Charcoal Co.: Kilns 1, 2, 3, 4, 5Cookeville......do......do......doDo.
Don P. Smith Chair Co.: Drying kilnLoudin......do......do......doJune 30, 1974.
Temple Industries: Conical burnerSavannahCh. V, sec. II. B; ch. VI, sec. II.D......do......doApr. 30, 1974.
Tennlite, Inc.: Two rotary kilnsGreen BrierCh. V, sec. II.B; ch. VII, sec. II......do......doJuly 30, 1974.
Tenn. Asphalt Co. & Road Builders, Inc.: Asphalt batching plantCumberland CityCh. V, sec. II.B; ch. VII, secs. II and IX, G; ch. VIII......do......doDec. 17, 1974.
Vulcan Materials Co.: Rock quarryEmory GapCh. V, sec. II.B; ch. VII, sec. II; ch. VIII......do......doMar. 31, 1974.
DoSavannahCh. V, sec. II.B; ch. VII, sec. II; ch. VIII......do......doJune 21, 1974.
DoParsonsCh. V, sec. II.B; ch. VII, sec. II; ch. VIII......do......doFeb. 18, 1974.
Cities Service (41-0073)CopperhillCh. VII, sec. 8June 19, 1973......doJuly 1, 1975.
Cities Service (42-0073)......doCh. VII, sec. 8......do......doDo.
Penn Dixie CementKingsportCh. VII, sec. 2Oct. 9, 1973......doDo.


(2) Chattanooga-Hamilton County compliance schedules:

Tennessee
SourceLocationRegulation involvedDate of adoptionEffective dateFinal compliance date
Chattanooga Public Schools:
(a) Elbert Long SchoolChattanoogaSec. 9(8)Feb. 8, 1973ImmediatelyJuly 1, 1974.
(b) Charles A. Bell School......doSec. 9(8)......do......doDo.
(c) G. Russel Brown School......doSec. 9(8)......do......doDo.
(d) Calvin Donaldwon School......doSec. 9(8)......do......doDo.
(e) East Chattanooga School......doSec. 9(8)......do......doDo.
(f) Highland Park School......doSec. 9(8)......do......doDo.
(g) Normal Park School......doSec. 9(8)......do......doDo.
(h) Piney Woods School......doSec. 9(8)......do......doDo.
(i) Ridgedale School......doSec. 9(8)......do......doDo.
(j) Frank H. Trotter School......doSec. 9(8)......do......doDo.
(k) Woodmore School......doSec. 9(8)......do......doDo.
(l) Rivermont School......doSec. 9(8)......do......doDo.
(m) St. Elmo School......doSec. 9(8)......do......doDo.
E.I. du Pont de Nemours & Co.:
(a) Nylon 66 evaporator Nos. 1-5......doSec. 9......do......doDo.
(b) Nylon auto clave Nos. 1-17......doSec. 9......do......doDo.
(c) Continuous polymerization lines I-III......doSec. 9......do......doDo.
(d) Continuous polymerization line IV......doSec. 9......do......doSept. 1, 1973.
(e) Lindburg furnace type 364830-E12-S......doSec. 9......do......doAug. 1, 1973.
(f) Lindburg furnace type 243624-E12-S......doSec. 9......do......doFeb. 1, 1974.
(g) Trent furnace model 862640A......doSec. 9......do......doMar. 1, 1974.
(h) Lindburg furnace type 364830-E12-S......doSec. 9......do......doApr. 1, 1974.
(i) Riley boiler......doSec. 9......do......doJuly 1, 1974.
(j) B & W boiler......doSec. 9......do......doDo.
General Tire Service......doSec. 9......do......doJan. 31, 1974.
Randolph Manufacturing Co., Inc......doSec. 9......do......doDo.
Southern Foundry Supply, Inc......doSec. 9......do......doMar. 31, 1973.
Tennessee Awning & Tent Co......doSec. 9Feb. 9, 1973......doJune 1, 1973.
United States Pipe & Foundry Co......doSec. 9Feb. 8, 1973......doNov. 1, 1973.


(3) Memphis-Shelby County compliance schedules:

Tennessee
SourceLocationRegulation involvedDate of adoptionEffective dateFinal compliance date
Desoto Hardwood Flooring Co.: Phase 1ChattanoogaSec. 9Apr. 5, 1973ImmediatelyMay 1, 1974.
Wabash, Inc.: Phase 1......doSecs. 3-17, 3-20......do......doApr. 1, 1974.


(4) Nashville-Davidson County compliance schedules:

Tennessee
SourceLocationRegulation involvedDate of adoptionEffective dateFinal compliance date
Bruce FlooringNashvilleSec. 4-1-9Feb. 7, 1973ImmediatelyDec. 31, 1973.


[38 FR 16169, June 20, 1973, as amended at 38 FR 22748, Aug. 23, 1973; 38 FR 24341, 24342, Sept. 7, 1973; 40 FR 3445, Jan. 22, 1975; 40 FR 3570, Jan. 23, 1975; 42 FR 10995, Feb. 25, 1977; 51 FR 40676, 40677, Nov. 7, 1986; 52 FR 24367, June 30, 1987; 54 FR 25258, June 14, 1989]

Sponsored links




ver las páginas en versión mobile | web

ver las páginas en versión mobile | web

© Copyright 2012, vLex. All Rights Reserved.

Contents in vLex United States

Explore vLex

For Professionals

For Partners

Company