46 CFR 31.10-22 - Notice and plans required.

Code of Federal Regulations - Title 46: Shipping

Linked as:

Text


TITLE 46 - SHIPPING

CHAPTER I - COAST GUARD, DEPARTMENT OF HOMELAND SECURITY

SUBCHAPTER D - TANK VESSELS

PART 31 - INSPECTION AND CERTIFICATION

31.10 - 22 - Notice and plans required.

  (a) The master, owner, operator, or agent of the vessel shall notify the Officer in Charge, Marine Inspection, whenever the vessel is to be drydocked regardless of the reason for drydocking.

  (b) Each vessel, except barges, that holds a Load Line Certificate must have on board a plan showing the vessel's scantlings. This plan must be made available to the Coast Guard marine inspector whenever the vessel undergoes a drydock examination, internal structural examination, cargo tank internal examination, or underwater survey or whenever repairs are made to the vessel's hull.

  (c) Each barge that holds a Load Line Certificate must have a plan showing the vessel's scantlings. The plan need not be maintained on board the barge but must be made available to the Coast Guard marine inspector whenever the barge undergoes a drydock examination, internal structural examination, cargo tank internal examination or underwater survey or whenever repairs are made to the barge's hull.

[CGD 84024, 52 FR 39651, Oct. 23, 1987]

Sponsored links




ver las páginas en versión mobile | web

ver las páginas en versión mobile | web

© Copyright 2012, vLex. All Rights Reserved.

Contents in vLex United States

Explore vLex

For Professionals

For Partners

Company