30 CFR 250.618 - Wireline operations.

Code of Federal Regulations - Title 30: Mineral Resources

Linked as:

Text


Title 30: Mineral Resources

CHAPTER II: MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR

SUBCHAPTER B: OFFSHORE

PART 250: OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF

Subpart F: Oil and Gas Well-Workover Operations

250.618 - Wireline operations.

The lessee shall comply with the following requirements during routine, as defined in ? 250.601 of this part, and nonroutine wireline workover operations:

(a) Wireline operations shall be conducted so as to minimize leakage of well fluids. Any leakage that does occur shall be contained to prevent pollution.

(b) All wireline perforating operations and all other wireline operations where communication exists between the completed hydrocarbon-bearing zone(s) and the wellbore shall use a lubricator assembly containing at least one wireline valve.

(c) When the lubricator is initially installed on the well, it shall be successfully pressure tested to the expected shut-in surface pressure.

[53 FR 10690, Apr. 1, 1988. Redesignated and amended at 63 FR 29479, 29485, May 29, 1998]

Sponsored links




ver las páginas en versión mobile | web

ver las páginas en versión mobile | web

© Copyright 2012, vLex. All Rights Reserved.

Contents in vLex United States

Explore vLex

For Professionals

For Partners

Company