Code of Federal Regulations - Title 30: Mineral Resources (December 2005)
Permanent Link:
http://cfr.vlex.com/vid/250-430-when-must-install-diverter-19694861
Id. vLex: VLEX-19694861
Click here to download this article in graphic format (Acrobat Reader)
TITLE 30 - MINERAL RESOURCES
CHAPTER II - MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR
SUBCHAPTER B - OFFSHORE
PART 250 - OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
subpart d - OIL AND GAS DRILLING OPERATIONS
250.430 - When must I install a diverter system?
You must install a diverter system before you drill a conductor or surface hole. The diverter system consists of a diverter sealing element, diverter lines, and control systems. You must design, install, use, maintain, and test the diverter system to ensure proper diversion of gases, water, drilling fluid, and other materials away from facilities and personnel.
[68 FR 8423, Feb. 20, 2003]
Try vLex for FREE for 3 days
Access legal information from United States including:
Try vLex without any commitment for 3 days and see why you need it.
3
days of Free Access