30 CFR 250.418 - What additional information must I submit with my APD?

Code of Federal Regulations - Title 30: Mineral Resources

Linked as:

Text


Title 30: Mineral Resources

CHAPTER II: MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR

SUBCHAPTER B: OFFSHORE

PART 250: OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF

Subpart D: Oil and Gas Drilling Operations

: Applying for A Permit to Drill

250.418 - What additional information must I submit with my APD

You must include the following with the APD:

(a) Rated capacities of the drilling rig and major drilling equipment, if not already on file with the appropriate District office;

(b) A drilling fluids program that includes the minimum quantities of drilling fluids and drilling fluid materials, including weight materials, to be kept at the site;

(c) A proposed directional plot if the well is to be directionally drilled;

(d) A Hydrogen Sulfide Contingency Plan (see ? 250.490), if applicable, and not previously submitted;

(e) A welding plan (see ?? 250.109 to 250.113) if not previously submitted;

(f) In areas subject to subfreezing conditions, evidence that the drilling equipment, BOP systems and components, diverter systems, and other associated equipment and materials are suitable for operating under such conditions;

(g) A request for approval if you plan to wash out or displace some cement to facilitate casing removal upon well abandonment; and

(h) Such other information as the District Manager may require.

[68 FR 8423, Feb. 20, 2003]

Sponsored links




ver las páginas en versión mobile | web

ver las páginas en versión mobile | web

© Copyright 2012, vLex. All Rights Reserved.

Contents in vLex United States

Explore vLex

For Professionals

For Partners

Company