10 CFR 205.378 - Disconnection of temporary facilities.

Code of Federal Regulations - Title 10: Energy

Linked as:

Text


Title 10: Energy

CHAPTER II: DEPARTMENT OF ENERGY

SUBCHAPTER A: OIL

PART 205: ADMINISTRATIVE PROCEDURES AND SANCTIONS

Subpart W: Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions

: Emergency Interconnection of Electric Facilities and the Transfer of Electricity to Alleviate An Emergency Shortage of Electric Power

205.378 - Disconnection of temporary facilities.

Upon the termination of any emergency for the mitigation of which the DOE ordered the construction of temporary facilities, such facilities shall be disconnected and any temporary construction removed or otherwise disposed of, unless application is made as provided in ? 205.379 for permanent connection for emergency use. This disconnection and removal of temporary facilities shall be accomplished within 30 days of the termination of the emergency unless an extension is granted by the DOE. The DOE shall be notified promptly when such removal of facilities is completed.

Sponsored links




ver las páginas en versión mobile | web

ver las páginas en versión mobile | web

© Copyright 2012, vLex. All Rights Reserved.

Contents in vLex United States

Explore vLex

For Professionals

For Partners

Company