170.474 - Who conducts the project closeout
The following table shows who must conduct the IRR construction project closeout and develop the report.
| If the project was completed by . . . | then . . . | and the closeout report must . . . |
| (a) BIA | The regional engineer or designee is responsible for closing out the project and preparing the report | (1) Summarize the construction project records to ensure compliance requirements have been met;(2) Review the bid item quantities and expenditures to ensure reasonable conformance with the PS&E and modifications; (3) Be completed within 120 calendar days of the date of acceptance of the IRR. construction project; and (4) Be provided to the affected tribes and the Secretaries. |
| (b) A tribe | Agreements negotiated under ISDEAA specify who is responsible for closeout and preparing the report | (1) Meet the requirements of ISDEAA;(2) Comply with 25 CFR 900.130(d) and 131(b) (10) and 25 CFR 1000.249, as applicable; (3) Be completed within 120 calendar days of the date of acceptance of the project; and (4) Be provided to all parties specified in the agreements negotiated under ISDEAA. |
Sponsored links
This document cites
- Code of Federal Regulations - Title 25: Indians - 25 CFR 900.130 - What role does the Indian tribe or tribal organization play during the performance of a self-determination construction contract?
- Code of Federal Regulations - Title 25: Indians - 25 CFR 1000.249 - What is the Secretary's role in a construction program in an AFA?
See other documents that cite the same legislation