Code of Federal Regulations - Title 18: Conservation of Power and Water Resources (December 2005)
Permanent Link:
http://cfr.vlex.com/vid/1304-202-sediment-erosion-provisions-19646917
Id. vLex: VLEX-19646917
Click here to download this article in graphic format (Acrobat Reader)
TITLE 18 - CONSERVATION OF POWER AND WATER RESOURCES
CHAPTER XIII - TENNESSEE VALLEY AUTHORITY
SUBCHAPTER B - SPECIAL REGULATIONS
PART 1304 - APPROVAL OF CONSTRUCTION IN THE TENNESSEE RIVER SYSTEM AND REGULATION OF STRUCTURES AND OTHER ALTERATIONS
subpart c - TVA - OWNED RESIDENTIAL ACCESS SHORELAND
1304.202 - General sediment and erosion control provisions.
(a) During construction activities, TVA shall require that appropriate erosion and sediment control measures be utilized to prevent pollution of the waters of the reservoir.
(b) All material which accumulates behind sediment control structures must be removed from TVA land and placed at an upland site above the 100-year floodplain elevation or the Flood Risk Profile Elevation (whichever is applicable).
(c) Disturbed sites must be promptly stabilized with seeding, vegetative planting, erosion control netting, and/or mulch material.
Try vLex for FREE for 3 days
Access legal information from United States including:
Try vLex without any commitment for 3 days and see why you need it.
3
days of Free Access