Text
Title 33: Navigation and Navigable Waters
CHAPTER I: COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
SUBCHAPTER J: BRIDGES
PART 117: DRAWBRIDGE OPERATION REGULATIONS
Subpart B: Specific Requirements
: Texas
117.955 - Buffalo Bayou.
(a) The draw of the Houston Belt and Terminal railroad bridge, mile 1.2 at Houston, and all drawbridges downstream of it, shall open on signal if at least 24 hours notice if given.
(b) The draws of the Union Pacific railroad bridge, mile 3.1, and the Houston Belt and Terminal railroad bridge, mile 4.3, need not be opened for the passage of vessels.
[CGD-8-89-11, 55 FR 2066, Jan. 22, 1990, as amended by CGD08-98-066, 63 FR 55030, Oct. 14, 1998]
Sponsored links