33 CFR 117.643 - Pine River (St. Clair).

Text




 

Title 33: Navigation and Navigable Waters

CHAPTER I: COAST GUARD, DEPARTMENT OF HOMELAND SECURITY

SUBCHAPTER J: BRIDGES

PART 117: DRAWBRIDGE OPERATION REGULATIONS

Subpart B: Specific Requirements

: Michigan

117.643 - Pine River (St. Clair).

The draw of the S29 bridge, mile 0.1 at St. Clair, shall open on signal from April 1 through November 30 from 2 a.m. to 8 a.m. and from 8 a.m. to 2 a.m. on the hour and one-half hour. From December 1 through March 31, the draw shall open on signal if at least 24 hours notice is given. Public vessels of the United States, state or local vessels used for public safety, and vessels in distress shall be passed through the draw as soon as possible.



Sponsored links




ver las páginas en versión mobile | web

ver las páginas en versión mobile | web

© Copyright 2012, vLex. All Rights Reserved.

Contents in vLex United States

Explore vLex

For Professionals

For Partners

Company