33 CFR 117.615 - Plum Island River.

Text




 

Title 33: Navigation and Navigable Waters

CHAPTER I: COAST GUARD, DEPARTMENT OF HOMELAND SECURITY

SUBCHAPTER J: BRIDGES

PART 117: DRAWBRIDGE OPERATION REGULATIONS

Subpart B: Specific Requirements

: Massachusetts

117.615 - Plum Island River.

The draw of the Plum Island Turnpike Bridge, mile 3.3 between Newburyport and Plum Island, shall operate as follows:

(a) From April 1 through November 30, 5 a.m. to 9 p.m., the draw shall open on signal if at least one hour advance notice is given by calling the number posted at the bridge. At all other times the draw shall open on signal if at least three hours advance notice is given.

(b) The owners of this bridge shall provide and keep in good legible condition, clearance gauges for each draw with figures not less than twelve (12) inches high, designed, installed and maintained according to the provisions of ? 118.160 of this chapter.

[CGD01-94-057, 60 FR 54431, Oct. 24, 1995]



Sponsored links




ver las páginas en versión mobile | web

ver las páginas en versión mobile | web

© Copyright 2012, vLex. All Rights Reserved.

Contents in vLex United States

Explore vLex

For Professionals

For Partners

Company