Text
Title 33: Navigation and Navigable Waters
CHAPTER I: COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
SUBCHAPTER J: BRIDGES
PART 117: DRAWBRIDGE OPERATION REGULATIONS
Subpart B: Specific Requirements
: Florida
117.301 - Massalina Bayou.The draw of the Tarpon Dock bascule span bridge, Massalina Bayou, mile 0.0 at Panama City, shall open on signal; except that from 9 p.m. until 11 p.m. on July 4, each year, the draw need not open for the passage of vessels. The draw will open at any time for a vessel in distress.
[66 FR 36467, July 12, 2001]
Sponsored links